A water-line project may involve changing bottle shape, volume, material or closure. Treat that change as a complete packaging-format review, not only a filler adjustment. Trace the proposed container through preparation, filling, closing and finished-pack handling to identify which parts and evidence are still missing.
Record the package and product requirements together
Provide drawings for the intended bottle and closure, plus the requirements established by your water-production team. Distinguish still and sparkling products where the technical review differs. Give each package a format code and keep its source drawings available to everyone reviewing the offered line.
Create a module-by-module format map
List container preparation, filling, closing, labelling, inspection and secondary packaging for the offered scope. Put the proposed format against each operation. Ask where compatibility is documented, where tooling exists and where an assessment is still needed. A supported bottle size on one machine does not confirm the complete route.
Identify upstream bottle supply
State whether the project receives finished bottles or includes bottle production. If PET blowing equipment is involved, request the relevant preform, mould and transfer information for specialist review. Sidel treats blowing configurations and moulds as application-specific choices; do not assume that every PET bottle in the plan is covered by an existing mould set.
Review handling during the transition
Ask the line reviewer to assess guides, transfers, accumulation and pack formation for the proposed container. Request the format-parts register and any relevant demonstration. Keep damage, instability or interruptions observed during a trial as recorded questions to investigate, rather than claiming that a container material alone determines line performance.
Make the changeover scope reviewable
Record physical parts, settings, checks and training required for each format change. Ask what is included in the sale and what must be sourced separately. Use an agreed production trial to close important uncertainties, with the container and module configuration documented, before relying on a general multi-format description in the quotation.
Buying checklist
- Bottle and closure drawing per format
- Still or sparkling requirements identified
- Module-by-module compatibility map
- Bottle-supply and blowing scope
- Handling parts and test observations
- Changeover work and exclusions recorded