When a line finishes sparkling water, give the subsequent still-water start its own timed record. The machine can produce the first pack before the quality team has completed the checks required to release it. Agree the process, approved conditions and sampling method with the plant before trialling the next run.
Use one clock for the last sparkling pack and all still-water decisions
Record the last accepted sparkling pack, the end of the authorised transition, the first still-water sample that meets the site’s criteria and the release decision. Identify any packs held between those milestones. Keep the package, product and receipt data tied to the same trial.
| Event | Illustrative time | What to capture |
|---|---|---|
| Last accepted sparkling pack | 08:40 | Lot, package and output record |
| First conforming still-water pack | 08:58 | Sample ID, approved results and operator |
| Quality authorises release | 09:05 | Approval and affected pack count |
| Packs made before release | Enter the real quantity | Hold, release or other assigned disposition |
In this example the first conforming still pack follows after 18 minutes and authorised release after 25. Use the measured interval that matches your production planning decision.