After a planned wet shutdown, use the approved restart procedure and ask quality which observations or samples the site requires. Record the equipment and circuit that were left in service condition, the planned checks and what authorises the next production stage. Keep restart material traceable.
Separate the release points in the record
Record the authorised transition or flush, the product sample and the first finished pallet decision. If a sample is late, note which output was held and who can release it. These timings help compare how much of the planned production window is available.
| Checkpoint | Evidence | Decision to record |
|---|---|---|
| Approved restart preparation | Status of equipment and site procedure | Who permits the next step |
| Water circuit check | Sample point, time and result | Approved progression or hold |
| Product and pack samples | Labelled samples and quality outcome | First acceptable pack or repeated test |
| First pallet | Lot identifier and quantity held | Authorised release and disposition |
Include shutdown and restart evidence in the water-line trial