Start with product, container and hygiene requirements. Review the entire project around the filler, including bottle production, utilities and downstream packaging.
- Which still or sparkling water formats are supported?
- What hygiene, air and water requirements need confirmation for the site?
Plan the water line from utilities to pack-out
Map documented air, water, cooling and power needs for each offered module. Check bottle transfers and finished-pack handling against the destination layout. Assign site-preparation and commissioning responsibilities before treating the quoted line as an operational installation.
Plan before dismantling
Document layout, cable and pipe routes, reference points, software backups, alignment and the sequence needed for reassembly.
Protect every component
Define cleaning, preservation, labelling, packing, lifting points, transport frames and environmental protection for the journey.
Prepare the destination
Confirm utilities, foundations, access, safety compliance, integration, commissioning resources and acceptance criteria.